The Prime Minister of India, Dr. Manmohan Singh flagged off the beautifully decorated first train in Kashmir at the Nowgam railway station in Srinagar this morning ie. Saturday, October 11, 2008.
(TOI): The first Kashmir train connects Srinagar to Rajwanshar in south Kashmir's Anantnag district.
The track is 66 km (to be extended in future when the 117km rail link will connect Baramulla in the north with Qazigund in the south and, eventually, should be integrated into India's massive national rail network.) and the train has 8 coaches.
The History: (TOI)
Kashmir was promised a rail link by Maharaja Pratap Singh, the region's Dogra ruler in 1892. The British assured to materialize that dream but nothing ever was done.
There were then different type of problems posed by nature herself and by man himself. Strife and terrorism came in the way and the challenge of boring through weak mountains and bridging huge crevasses stalled the project several times.
External Links:
No comments:
Post a Comment
Anonymous Writers, Kindly do not waste your time here. If you write promotional messages here, they will never be displayed. Kindly spend your time somewhere else. Your marketing efforts are destroying the pristine nature of Blogging.